Answer: 0
Step-by-step explanation:
Given that :
Mean score on test = 5
Standard deviation on test = 2
Distribution = normal
The mean value when Converted to a z - distribution :
Zscore = (x - mean) / standard deviation.
Hence z score for the mean score will be :
X = mean score
Zscore = ( 5 - 5) / 2
Zscore = 0 / 2
Zscore = 0
Mean value when Converted to a z distribution will be 0
What is the solution set of -|x| =
-8?
Answer:
\(\{8,-8\}\)
Step-by-step explanation:
\(~~~-|x| = -8\\\\\implies |x| = \dfrac{-8}{-1}\\\\\implies |x| = 8\\\\\implies x = \pm 8\\\\\text{Hence, the solution set is}~ \{8,-8\}\)
log5 (2x-7) = 0
how to solve for x
The solution to the logarithm equation is log5(2x-7) = 0 is x = 4.
What is logarithm ?
A logarithm is a mathematical function that represents the exponent to which a fixed number, called the base, must be raised to produce a given value. In other words, a logarithm is the inverse operation of exponentiation.
For example, if we have the equation \(10^3 = 1000\), the logarithm of 1000 with base 10 is 3, because \(10^3 = 1000\). Similarly, the logarithm of 8 with base 2 is 3, because \(2^3 = 8.\)
According to the question:
To solve for x in the equation:
log5(2x-7) = 0
We can use the definition of logarithms which states that log_b(x) = y is equivalent to \(b^y = x.\)
Applying this to the given equation, we get:
\(5^0 = 2x - 7\)
\(1 = 2x - 7\)
\(2x = 8\)
\(x = 4\)
Therefore, the solution to the equation is log5(2x-7) = 0 is x = 4.
To know more about logarithm visit:
https://brainly.com/question/30226560
#SPJ1
You have been assigned as engineering on building construction in Johor Bahru, responsible for procurement stage activity. (a) Draw a figure that explain Procurement steps. (4 mark) (b) Give your justification about each procurement stages and relevant responsibility that you have to do in order to accomplish the successful job.
Effective management of procurement stages can help in successful execution of the construction project in Johor Bahru
(a) Figure explaining Procurement Steps:
1. Identification of Needs
2. Vendor Selection & Prequalification
3. Solicitation & Bid Evaluation
4. Contract Award
5. Contract Management and Administration
6. Performance Review and Evaluation
7. Contract Closeout
(b) Justification and Relevant Responsibilities for Each Procurement Stage:
Identification of Needs:
Justification: This stage involves understanding and defining the requirements and specifications of the construction project.
Relevant Responsibilities: As the engineering responsible for procurement, you need to collaborate with the project team to determine the materials, equipment, and services needed for the project and ensure they align with the project goals and objectives.
Vendor Selection & Prequalification:
Justification: This stage ensures that the vendors being considered for the project are capable of meeting the project's requirements.
Relevant Responsibilities: Your responsibility would be to research and identify potential vendors, assess their qualifications and capabilities, and shortlist the most suitable vendors based on their expertise, experience, and financial stability.
Solicitation & Bid Evaluation:
Justification: This stage involves requesting bids from the shortlisted vendors and evaluating them to select the best offer.
Relevant Responsibilities: You would be responsible for preparing and issuing bid documents, managing the bid process, reviewing and evaluating received bids based on criteria such as price, quality, compliance, and contractual terms, and recommending the most advantageous bid to the project team.
Contract Award:
Justification: This stage involves selecting the vendor and awarding the contract for the project.
Relevant Responsibilities: Your role would be to facilitate the contract award process, negotiate contract terms and conditions, and ensure that the selected vendor meets all the necessary requirements to proceed with the project.
Contract Management and Administration:
Justification: This stage focuses on managing and administering the contract throughout the project's duration.
Relevant Responsibilities: You would be responsible for overseeing contract execution, monitoring vendor performance, ensuring compliance with contract terms, managing any changes or disputes that may arise, and maintaining effective communication with the vendor.
Performance Review and Evaluation:
Justification: This stage involves assessing the vendor's performance during and after the project.
Relevant Responsibilities: Your responsibility would be to conduct performance reviews, evaluate the vendor's adherence to quality standards, timeliness, and overall satisfaction with their work, and provide feedback to the project team for future vendor selection.
Contract Closeout:
Justification: This stage marks the end of the contract and involves finalizing all the project's contractual and administrative obligations.
Relevant Responsibilities: Your role would be to ensure all deliverables have been met, conduct a final inspection, settle any outstanding payments or claims, and close the contract in accordance with the agreed-upon terms and procedures.
By effectively managing each procurement stage and fulfilling the relevant responsibilities, you can contribute to the successful execution of the construction project in Johor Bahru.
To know more about vendors , visit;
https://brainly.com/question/14897276
#SPJ11
2,5,2,9,13,2,17. Calculate the sum of the first 100 of the terms
The sum of the first 100 terms is 100 times the average of the given terms, which is (2+5+2+9+13+2+17)/7 = 50/7. Thus, the sum is approximately 100*(50/7) = 714.29.
To calculate the sum of the first 100 terms, we first need to determine the average of the given terms. We add up all the terms: 2+5+2+9+13+2+17 = 50. Then we divide this sum by the number of terms, which is 7 in this case, to find the average: 50/7 = 7.14.
Since the sequence is not specified beyond the given terms, we assume the sequence repeats or continues in some pattern. In this case, the sum of the first 100 terms would be 100 times the average: 100*7.14 = 714.29.
Therefore, the sum of the first 100 terms is approximately 714.29.
Learn more about sequence repeats or continues here:
https://brainly.com/question/15840653
#SPJ11
Please help for 15 points!
Answer:
There's nothing there
Step-by-step explanation:
what features of the distribution of the hispanic population in us counties are apparent in the map but not in the histogram? what features are apparent in the histogram but not the map?
The map visually represents the spatial distribution of the Hispanic population across U.S. counties, allowing for the identification of patterns and clusters. On the other hand, the histogram provides a quantitative representation of the distribution, illustrating the frequency or density of Hispanic population within specific ranges or categories.
The map reveals certain features that may not be apparent in the histogram. For instance, it allows us to observe spatial concentrations or clusters of Hispanic population, such as regions with high densities of Hispanic residents or areas where the Hispanic population is more dispersed. These spatial patterns can provide insights into factors like immigration patterns, cultural heritage, or historical settlement patterns that influence the distribution of the Hispanic population in the United States.
Conversely, the histogram highlights features that may not be readily visible in the map. The histogram enables a more detailed examination of the distribution within specific population ranges or categories. It can reveal the frequency or density of the Hispanic population within each range, allowing for comparisons across different counties or regions. By examining the histogram, one can identify variations in the size or proportion of the Hispanic population in different areas, potentially indicating demographic disparities or variations in population growth rates.
In summary, the map provides a visual understanding of the spatial distribution of the Hispanic population, highlighting clusters and patterns, while the histogram offers a quantitative representation, revealing variations in population density within specific ranges or categories. Both tools are valuable for analyzing and interpreting the distribution of the Hispanic population in U.S. counties, providing complementary perspectives for understanding demographic trends and patterns.
Learn more about distribution here:
https://brainly.com/question/29664127
#SPJ11
Determine the value of h in the equation h minus four sevenths equals two sevenths
Answer:
h = 6/7
Step-by-step explanation:
h minus four sevenths equals two sevenths
minus means -
equals means =
h - four sevenths = two sevenths
four sevenths means 4/7
two sevenths = 2/7
h - 4/7 = 2/7
add 4/7 to both sides to isolate h
h = 6/7
Answer: h =6/7
Step-by-step explanation: 4/7 + 2/7 = 6/7 so h - 4/7 = 2/7 h = 6/7
Suppose y varies inversely with x, and y = 49 when x = 17
. What is the value of x when y = 7 ?
Answer:
119 is the value of x when y = 7
Step-by-step explanation:
Since y varies inversely with x, we can use the following equation to model this:
y = k/x, where
k is the constant of proportionality.Step 1: Find k by plugging in values:
Before we can find the value of x when y = k, we'll first need to find k, the constant of proportionality. We can find k by plugging in 49 for y and 17 for x:
Plugging in the values in the inverse variation equation gives us:
49 = k/17
Solve for k by multiplying both sides by 17:
(49 = k / 17) * 17
833 = k
Thus, the constant of proportionality (k) is 833.
Step 2: Find x when y = k by plugging in 7 for y and 833 for k in the inverse variation equation:
Plugging in the values in the inverse variation gives us:
7 = 833/x
Multiplying both sides by x gives us:
(7 = 833/x) * x
7x = 833
Dividing both sides by 7 gives us:
(7x = 833) / 7
x = 119
Thus, 119 is the value of x when y = 7.
A theater manager is planning an upcoming concert. Regular tickets will cost $12 and student tickets will cost $8. The theater can seat at most 200 people. The manager wants to collect at least $1000 from ticket sales.
Let x represent the number of regular tickets sold. Let y represent the number of student tickets sold.
Which inequalities are among the constraints for this situation?
Select each correct answer.
x+y≤200
x+y≥1000
12x+8y≤200
12x+8y≥1000
12x+8y≤1000
x+y≥200
Answer:
12x+8y≥1000
Step-by-step explanation:
write an equation using slope intercept form 4,-1 and 0,1
Answer:
y = -0.5x + 1
Step-by-step explanation:
The slope intercept form of a line is given by:
y = mx + b
where m is the slope of the line and b is the y-intercept (i.e. the point at which the line crosses the y-axis). To find the equation of a line using two points, we can use the slope formula to calculate the slope, then use one of the points to find the y-intercept.
The slope of a line is given by:
m = (y2 - y1) / (x2 - x1)
Substituting the coordinates of the two given points into this formula, we get:
m = (-1 - 1) / (4 - 0) = -2 / 4 = -1/2
Now that we know the slope of the line, we can use one of the points to find the y-intercept. Let's use the point (4,-1):
y = mx + b
-1 = (-1/2) * 4 + b
-1 = -2 + b
b = 1
Therefore, the equation of the line that passes through the points (4,-1) and (0,1) in slope intercept form is:
y = (-1/2)x + 1
Note that the equation can also be written as:
y = -0.5x + 1
How to graph it on a coordinate plan to the right 5x-3y=18
Tο shift the graph tο the right, we can simply add a pοsitive cοnstant tο the x values οf each pοint befοre plοtting them. Fοr example, if we want tο shift the graph tο the right by 2 units.
What is cοοrdinate plan?The intersectiοn οf twο number lines creates a twο-dimensiοnal plane knοwn as a cοοrdinate plane. The x-axis, a hοrizοntal number line, and the y-axis, a vertical number line, are twο examples οf these number lines.
Tο graph the equatiοn 5x - 3y = 18 οn a cοοrdinate plane, we can fοllοw these steps:
1. Sοlve fοr y in terms οf x:
5x - 3y = 18
-3y = -5x + 18
y = (5/3)x - 6
2. Chοοse sοme values fοr x and use the equatiοn tο find the cοrrespοnding y values. Fοr example, we can chοοse x = 0, 3, and 6:
When x = 0: y = (5/3)(0) - 6 = -6
When x = 3: y = (5/3)(3) - 6 = -3
When x = 6: y = (5/3)(6) - 6 = 2
3. Plοt the pοints (0, -6), (3, -3), and (6, 2) οn the cοοrdinate plane.
4. Draw a straight line passing thrοugh these three pοints. This line represents the graph οf the equatiοn 5x - 3y = 18.
To know more about coordinate plan visit,
https://brainly.com/question/27481419
#SPJ1
A circle is centered on point B. Points A, C and D lie on its circumference.
If ZABC measures 46°, what does ZADC measure?
Step-by-step explanation:
given: B is the centered poin of the circle
points A,C,D lies on its circumference
measure angle ABC is 46⁰
<ADC is inscribed in the circle
<ABC is the central angle
to find: what is the measure of angle ADC?
solution:
inscribed angle therom states that an inscribe angle is half of a central angle that subtends the same arc
hence, <ADC = 1/2 × <ABC
<ADC= 1/2 × 46⁰
<ADC=1/2 ×46⁰
<ADC= 23⁰
HOPE IT HELPED!!
Drag the tiles to the correct boxes to complete the pairs. Not all tiles will be used.
Match each system of equations to its graph.
Complete the table for the given rule. rule: y = x/2
Answer:
the given function is a linear function passing through Origin. Therefore, to complete the table for the given rule, we can use the given rule y = x/2 and substitute the values of x to get the corresponding values of y. For example, if x = 2, then y = 2/2 = 1. Similarly, if x = 4, then y = 4/2 = 2. Therefore, the completed table for the given rule is:
x y
0 0
2 1
4 2
6 3
8 4
Helpful conversions: 1 acre =43,560 square feet 1 hectare =10,000 square meters 1lb=454 grams 1 kg=2.2lbs=1000grams 1. Scouting for cover crop establishment in the field requires conversion of your massbased seeding rate (e.g., lbs/acre) to a population-based establishment rate (e.g., plants/f? ). Let's practice doing that. Convert the following seeding rates: a. Cereal rye - 60 ibs/acre = H seeds/square foot b. Crimson clover −15 kg/ha= H seeds/square meter 2. Convert the following population-based seeding rates to mass-based seeding rates. a. Oats −30 plants/square foot = Ibs seedlacre b. Hairy vetch −20 plants/square meter = kg seedsha 3. Your farm manager wants you to drill crimson clover seed, but the seed hasn't arrived yet and you don't know if it's coated or not. If the seed is not coated, the seeding rate is 20 blacre. Will you need to increase or decrease your seeding rate if the seed is coated?
Coating the seed typically improves seed quality and germination rates, so the same seeding rate can be maintained even with coated seed.
To convert mass-based seeding rates to population-based establishment rates, we need to consider the area conversion factors provided:
a. Given a seeding rate of 60 lbs/acre for cereal rye, we can convert it to seeds per square foot by using the conversion factor of 1 acre = 43,560 square feet.
b. Given a seeding rate of 15 kg/ha for crimson clover, we can convert it to seeds per square meter using the conversion factor of 1 hectare = 10,000 square meters.
To convert population-based seeding rates to mass-based seeding rates, we can use the given area conversion factors:
a. Given a seeding rate of 30 plants/square foot for oats, we can convert it to pounds of seed per acre.
b. Given a seeding rate of 20 plants/square meter for hairy vetch, we can convert it to kilograms of seed per hectare.
Learn more about square here:
https://brainly.com/question/14198272
#SPJ11
The amount of money in an account may increase due to rising stock prices and decrease due to falling stock prices. Mason is studying the change in the amount of money in two accounts, A and B, over time.
The amount f(x), in dollars, in account A after x years is represented by the function below:
f(x) = 10,125(1.83)x
Part A: Is the amount of money in account A increasing or decreasing and by what percentage per year? Justify your answer. (5 points)
Part B: The table below shows the amount g(r), in dollars, of money in account B after r years.
r (number of years) 1 2 3 4
g(r) (amount in dollars) 9,638 18,794.10 36,648.50 71,464.58
Which account recorded a greater percentage change in amount of money over the previous year? Justify your answer.
(a) The amount will be increasing by 83%.
(b) Part B's account has a higher percentage change in money over the preceding year than Part A's account.
A part or quantity in every hundred is defined as a percentage. It's a fraction having a denominator of 100. The percentage difference is the change in the value of a quantity over time expressed as a percentage difference. Percentage Change is a term used to describe the growth or decrease in a quantity expressed in percentages.
Find:
Whether the amount is increasing or decreasing over the years and which is experiencing a greater change.
From the given equation,1.831>1 , this shows that money in account A is 83% more, compared to its previous year. The amount will be increasing by 83%.
Part B:
The change in each consecutive term is 94%. This shows that the consecutive term is multiplied by 94% the previous year's amount. As a result, Part B's account has a higher percentage change in money over the preceding year than Part A's account.
Hence we get the required answer.
Learn more about Functions here:
brainly.com/question/25638609
#SPJ4
what is -12x-5(-8)=40
Answer: 0
Step-by-step explanation:
Answer:
x = 0
Step-by-step explanation:
A casino offers the following game: you draw one card from a standard 52-card deck. If you draw a jack, you win $1.25. If you draw a queen, you win $3.25. If you draw a king, you win $4.5 dollars. If you draw any ace except the ace of spades, you win $6.5. If you draw the ace of spades, you win $7.75. The entry fee to play this game is $1.75. Compute the expected value of this gamble (include the entry fee in your expected value).
Let \(W\) be the random variable for the winnings from playing the game once.
• There are 4 jacks in the deck, so you draw a jack with probability 4/52 = 1/13. In this case you "win" $1.25 - $1.75 = -$0.50.
• There are 4 queens, with draw probability 4/52 = 1/13 and winnings $3.25 - $1.75 = $1.50.
• There are 4 kings, with draw probability 4/52 = 1/13 and winnings $4.50 - $1.75 = $2.75.
• There are 4 aces, and 3 of these are not of the spade suit, so the probability of drawing any of these is 3/52 and you win $6.50 - $1.75 = $4.75.
• There is only 1 ace of spaces, with draw probability 1/52 and winnings $7.75 - $1.75 = $6.00.
• Adding these up, it follows that the probability of drawing any other card is 1 - (1/13 + 1/13 + 3/52 + 1/52) = 10/13, in which you have the privilege of "winning" -$1.75.
So, the probability mass function for \(W\) is
\(\mathrm{Pr}(W=w) = \begin{cases} \dfrac1{13} & \text{if } w \in \{-\$0.50, \$1.50, \$2.75\} \\\\ \dfrac3{52} & \text{if } w = \$4.75 \\\\ \dfrac1{52} & \text{if } w = \$6.00 \\\\ \dfrac{10}{13} & \text{if } w = -\$1.75 \\\\ 0 & \text{otherwise} \end{cases}\)
The expected winnings from playing one round of this game are
\(\Bbb E[W] = \displaystyle \sum_w w\,\mathrm{Pr}(W=w)\)
\(\Bbb E[W] = \dfrac{-\$0.50 + \$1.50 + \$2.75}{13} + \dfrac{3\cdot\$4.75}{52} + \dfrac{\$6.00}{52} + \dfrac{10\cdot(-\$1.75)}{13}\)
\(\Bbb E[W] \approx \boxed{-\$0.67}\)
2/5
of an hour (in minutes)?
To convert hour into minute: (No. of hour × 60) minutes
So, 2/5 hours = (2/5 × 60) minutes = (120/5) minutes = 24 minutes
2\5 is 0.4 so 0.4 multiplied by 60 u get 24 so the answer is 24 minutes
Cooper used 98 feet of string to braid 4 hot pads. How any feet of string are in each hot pad? Write and solve an equation to find the answer
Answer:
24.5 ft
Step-by-step explanation:
98 = 4x
24.5 = x
Answer:
4x=98 --how to solve is below
Step-by-step explanation:
4x=98
divide both sides by four
4x/4=98/4
x=24.5
.A system consists of five identical components connected in series as shown:
A system consists of five identical components con
As soon as one components fails, the entire system will fail. Suppose each component has a lifetime that is exponentially distributed with ? = 0.01 and that components fail independently of one another. Define eventsAi = {ith component lasts at least t hours}, i = 1, . . . , 5, so that the Ais are independent events. Let X = the time at which the system fails
The time at which the system fails, denoted by X, is the minimum of the lifetimes of the five components.
In this system, each component has a lifetime that follows an exponential distribution with a parameter λ = 0.01. The exponential distribution is commonly used to model the time until an event occurs in a system with a constant failure rate.
The probability that a component lasts at least t hours is given by P(Ai) = e^(-λt), where Ai is the event that the ith component lasts at least t hours.
Since the components fail independently of one another, the probability that all five components last at least t hours is the product of their individual probabilities: P(A1 ∩ A2 ∩ A3 ∩ A4 ∩ A5) = e^(-λt)^5 = e^(-5λt).
Now, let X be the time at which the system fails, which is the minimum of the lifetimes of the five components. Since X is the minimum, we can write X = min(T1, T2, T3, T4, T5), where Ti represents the lifetime of the ith component.
The probability distribution of X can be obtained by considering the complement event. The complement of X > t is that all five components last at least t hours, which is P(X > t) = P(A1 ∩ A2 ∩ A3 ∩ A4 ∩ A5) = e^(-5λt).
Therefore, the time at which the system fails, X, follows an exponential distribution with a parameter of 5λ = 0.05. This means that the system has a constant failure rate of 0.05 and the probability density function (pdf) of X is given by f(x) = 0.05 * e^(-0.05x).
Visit here to learn more about probability:
brainly.com/question/31828911
#SPJ11
Consider an election with three candidates with the following results:
(ACB) (BAC) (CBA) (CAB)
2
5
4
2
a. Is there a majority winner? If not, who is the plurality winner?
b. Who wins the election using the Borda count method? c. Who wins if he or she first eliminates the one with the most last-place votes and then has a runoff
between the other two?
If -2y = x and 3x + 2y = -4, then what is xy?
Answer:
1
Step-by-step explanation:
3(-2y) +2y = -4
-6y+2y=-4
-4y=-4
y=1
to estimate the percentage of all their customers that would buy a new flavor, an ice cream shop surveys the first five customers that place an order.will this likely give an accurate estimate of this percentage?select from the drop-down menus to correctly complete the statement.this method is choose... to give an accurate estimate of the percentage since it choose... from a large enough randomly selected sample of customers
This method is unlikely to give an accurate estimate of the percentage since it chooses only 5 customers from a small sample size, which may not be representative of the entire population of customers.
In statistical terms, the sample size of 5 is considered very small and may not be large enough to capture the variability in customers' preferences. A larger sample size would increase the precision and accuracy of the estimate of the percentage of customers who would buy a new flavor.
A small sample size may lead to unreliable estimates and may not be representative of the population, highlighting the importance of using appropriate sample sizes in statistical analysis.
Learn more about percentage :
https://brainly.com/question/30742521
#SPJ4
There is a 4 out of 20 chance that you can win a game. How many "wins" would you predict if you played the game 40 times?
is this correct?
I just started learning this
10. IDX Tech is looking to expand its investment in advanced security systems. The project will be financed with equity. You are trying to assess the value of the investment and must estimate its cost of capital. You find the following data for a publicly-traded firm in the same line of business: Debt Outstanding (book value, AA-rated) $423 million Number of shares of common stock $67 million Stock price per share $17.29 Book value of equity per share $6.24 Beta of equity 1.19 What is your estimate of the project's beta? What assumptions do you need to make?
To estimate the project's beta, we need to make assumptions and use available data. Given the information provided for a publicly traded firm in the same line of business, including the debt outstanding, number of shares, stock price per share, book value of equity per share, and the beta of equity, we can calculate an estimate of the project's beta.
The beta measures the systematic risk of an investment relative to the overall market. To estimate the project's beta, we can use the leveraged beta approach. Since the project will be financed with equity, we assume that the project's beta will be equal to the equity beta of the publicly-traded firm in the same line of business. Therefore, the estimated beta of the project would be 1.19, based on the given information.
It is important to note that this estimation relies on the assumption that the project's risk profile and systematic risk are similar to that of the publicly-traded firm used as a reference. Additionally, this approach assumes that the project is solely financed with equity and does not take into account any potential debt financing or other factors that may affect the project's beta.
To learn more about investment: -brainly.com/question/15105766
#SPJ11
Determine the equation of the altitude from A.
Answer:
y = - 3x + 11
Step-by-step explanation:
the altitude is a line from the vertex A drawn perpendicular to the opposite side BC
calculate the slope of BC using the slope formula
m = \(\frac{y_{2}-y_{1} }{x_{2}-x_{1} }\)
with (x₁, y₁ ) = B (- 7, 3 ) and (x₂, y₂ ) = C (- 1, 5 )
\(m_{BC}\) = \(\frac{5-3}{-1-(-7)}\) = \(\frac{2}{-1+7}\) = \(\frac{2}{6}\) = \(\frac{1}{3}\)
given a line with slope m then the slope of a line perpendicular to it is
\(m_{perpendicular}\) = - \(\frac{1}{m}\) = - \(\frac{1}{\frac{1}{3} }\) = - 3
the equation of a line in slope- intercept form is
y = mx + c ( m is the slope and c the y- intercept ) , then
y = - 3x + c ← is the partial equation
to find c substitute A (4, - 1 ) into the partial equation
- 1 = - 12 + c ⇒ c = - 1 + 12 = 11
y = - 3x + 11 ← equation of altitude from A
Which linear function represents this table of values? y=16x+8 y=6x−20 y=43x−6 y=34x+1
Answer:
(See Pic)
Step-by-step explanation:
Pic
While standing on top of a hill at a ski resort, Lisa spots the ski lodge below. If the vertical height of the hill is 1209 feet and the angle of depression is 53°, what distance must Lisa ski in order to reach the lodge?
Answer:
1514 feet
Step-by-step explanation:
We solve using the trigonometric function of Sine
sin θ = Opposite/ Hypotenuse
θ = Angle of depression = 53°
Opposite = Vertical height = 1209 feet
Hypotenuse = x =??
Hence,
sin 53 = 1209 feet/x
Cross Multiply
sin 53 × x = 1209 feet
x = 1209 feet/ sin 53
x = 1513.8320107 feet
Approximately = 1514 feet
Therefore, the distance Lisa must ski to reach the lodge is 1514 feet